Manufacturing Operations Management (MOM) | Thanh PLM Tư Vấn Các Dịch Vụ CAD/CAM/CAE/PLM/IT Tại Việt Nam

Opcenter APS

Planning for a more resilient supply chain | Opcenter

Using digital collaboration to achieve productivity and delivery goals When manufacturers are asked to characterize their supply chain today, resilient…

quality action dash

Boosting on-time delivery of quality management activities

By fully considering and addressing quality from the very beginning of a product development and production cycle, manufacturers can achieve “best-in-class” outcomes and avoid costly variations in advanced planning or implementation stages.

Microport 900x729 1

Leveraging digitalization to accelerate production lead time and secure the quality of traceability – The MicroPort case

High performance is critical. MicroPort CRM (Cardiac Rhythm Management) is a business unit of MicroPort Scientific Corporation that manufactures pacemakers, implantable defibrillators, pac­ing leads, and Holter monitors for patients with cardiac rhythm disorders. MicroPort CRM’s solutions are Class III products, which means they are strictly regulated by regulatory authorities and must have the highest level

scanfil 900x697 1

Scanfil realizes 10% – 40% improvement in manufacturing KPIs with Siemens Opcenter

Scanfil is a leading electronics manufacturer with 10 production sites across Europe, the United States, and China. The Suzhou, China site was established in 1998 and has grown to 600 employees. A vertically integrated contract manufacturer, Scanfil Suzhou manufactures the customer’s entire electronics product, including PCBA, FPC, cable harness, box build, and integration services. Scanfil’s

production planning scheduling industry40

Production planning and scheduling at an Industry 4.0 level

What is required to achieve the best performance on the delivery of production at an Industry 4.0 level? The machines and equipment of cyber-physical systems are currently able to communicate their monitoring and control in real-time. However, there is not much benefit if each resource does not receive the instructions for the tasks to be